Energy performance-based contracts; roof replacement
Posted by caunderw on Jul. 7, 2022 / Legislative / Subscribe 0
This change to Code of Virginia section 45.2-1703 (Energy performance-based contract procedures) allows a roof replacement to be a part of a larger energy performance-based contract or operational efficiency measure, when the roof replacement is necessary for the completion of the other conservation or efficiency measures. Current law excludes roof replacements as part of such projects. The contracting entity has the option to procure a roof replacement even if it’s not necessary for the installation of the efficiency measure, if replacement of more than 20 percent of the roof is necessary to install such measure. Such roof replacements procured separately from a larger energy conservation or operational efficiency measure, including solar, shall also be publicly noticed on the Department of General Services' central electronic procurement website. All roof replacement projects procured separately pursuant to this subdivision shall be designed by a licensed architect or professional engineer.
The change applies to any legislative, executive or judicial body, agency, office, department, authority, post, commission, committee, institution, board or political subdivision created by law to exercise some sovereign power or to perform some governmental duty, and empowered by law to undertake the activities described under the VPPA, including any independent agency of the Commonwealth, and any metropolitan planning organization or planning district commission which operates exclusively within the Commonwealth of Virginia.
Read the final text



0 Comments